Peak load plant

Peak load plant
  A plant usually housing old, low-efficiency steam units, gas turbines, diesels, or pumped-storage hydroelectric equipment normally used during the peak-load periods.
  U.S. Dept. of Energy, Energy Information Administration's Energy Glossary

Energy terms . 2014.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • peak load — noun : the maximum load carried during a given period (as by a railroad, telegraph line, power plant, pumping station) the person who uses the highways only on such days as … Labor Day makes a marginal contribution to the peak load W.H.Anderson * …   Useful english dictionary

  • peak-load power plant — pikinė elektrinė statusas T sritis Energetika apibrėžtis Elektrinė, gaminanti elektros energiją tik didžiausio vartojimo poreikio metu, trumpiau dirbanti, dažnai mažiau ekonomiška. atitikmenys: angl. peak load power plant vok. Spitzenkraftwerk,… …   Aiškinamasis šiluminės ir branduolinės technikos terminų žodynas

  • Peak Load Power plant —   A power generating station that is normally used to produce extra electricity during peak load times …   Energy terms

  • Peak load power plant —   A power generating station that is normally used to produce extra electricity during peak load times.   California Energy Comission. Dictionary of Energy Terms …   Energy terms

  • Peak load month —   The month of greatest plant electrical generation during the winter heating season (Oct Mar) and summer cooling season (Apr Sept), respectively.   U.S. Dept. of Energy, Energy Information Administration s Energy Glossary …   Energy terms

  • Peak demand — is used to refer to a historically high point in the sales record of a particular product. In terms of energy use, peak demand describes a period of strong consumer demand. Contents 1 Peak load 1.1 Off peak 1.2 Response …   Wikipedia

  • Load Factor —   The ratio of average energy demand (load) to maximum demand (peak load) during a specific period.   The ratio of the average load supplied to the peak or maximum load during a designated period. Load factor, in percent, also may be derived by… …   Energy terms

  • Peak uranium — is the point in time that the maximum global uranium production rate is reached. After that peak, the rate of production enters a terminal decline. While Uranium is used in nuclear weapons, its primary use is for energy generation via nuclear… …   Wikipedia

  • Load factor — may refer to:* Capacity factor, the ratio of the actual output of a power plant over a period of time and its output if it had operated a full capacity of that time period * Load factor (aerodynamics), n, is the vector expressed by the ratio of… …   Wikipedia

  • Load balancing (electrical power) — (daily peak demand reserve) refers to the use of various techniques by electrical power stations to store excess electrical power during low demand periods for release as demand rises. [cite web url=http://www.electricitystorage.org/technologies.h… …   Wikipedia